Datacentre Building
Responsible for all permanent works design. This project involved the adaption of an existing multi-bay large area warehouse, into a new data centre. This required the design and construction of a full mezzanine level structure over the entire area (equivalent in area to 6 football pitches) The specification for the structure also required the design of parts of the building for anti-terrorist measures.